Managed 20-member team during construction of pre-fabricated 400-ton hops and grain blending and load-out facilities, involving variable mechanic temperature controls.
Managed 20-member team during construction of pre-fabricated 400-ton hops and grain blending and load-out facilities, involving variable mechanic temperature controls.